Casing Head vs Tubing Head: Key Differences, Functions & Selection Guide

Learn the essential differences between casing heads and tubing heads in wellhead assemblies. Covers functions, installation sequence, pressure ratings, and how to specify each component for your well design.

Casing heads and tubing heads are two of the most fundamental components in any wellhead assembly. While they may look similar to the untrained eye, they serve distinctly different functions and are installed at different stages of the well construction process. Confusing the two can lead to procurement errors, improper well design, and safety risks. This guide explains the differences, functions, and selection criteria for each component.

What Is a Casing Head?

A casing head is the lowermost wellhead component, installed directly on the surface casing string. Its primary functions are to support the weight of subsequent casing strings, provide a seal between the surface casing and the next casing string, and provide side outlets for fluid returns during drilling and cementing operations.

Casing heads are available in three main connection types:
- Slip-on casing heads: Welded to the surface casing, providing a permanent, leak-tight connection. Common for onshore wells.
- Threaded casing heads: Screwed onto threaded surface casing. Used for low to medium pressure applications.
- Flanged casing heads: Bolted to a casing flange welded on the surface casing. Preferred for high-pressure and offshore applications.

The casing head serves as the foundation for the entire wellhead stack — everything above it depends on its structural and pressure integrity.

What Is a Tubing Head?

A tubing head is installed above the uppermost casing head or casing spool, at the top of the casing program. Its primary functions are to support the full weight of the production tubing string, seal the annulus between the tubing and the production casing, and provide access to the tubing-casing annulus for monitoring, gas lift, or chemical injection.

Key design features of tubing heads:
- Tubing hanger landing profile: The internal profile that receives and supports the tubing hanger, which in turn supports the tubing string.
- Annulus outlets: Typically two or more side outlets for accessing the A-annulus (between tubing and production casing). These may be threaded, flanged, or studded connections.
- Top connection: The top flange or studded connection that mates with the tubing head adapter or directly with the Christmas tree.

Tubing heads are designed to accommodate the tubing hanger running and landing procedure, which may involve hydraulic setting tools or mechanical lockdown mechanisms.

Installation Sequence: Where Each Goes

Understanding the wellhead stack sequence helps clarify the roles of each component:

Typical wellhead stack (bottom to top): 1. Conductor Pipe — Installed first, supports the wellhead structure 2. Surface Casing — Cemented in place 3. Casing Head — Installed on surface casing, supports next casing string 4. Intermediate Casing — Run through casing head, cemented 5. Casing Spool — Installed between casing heads (if multiple intermediate strings) 6. Production Casing — Run and cemented 7. Tubing Head — Installed on top of the last casing head/spool 8. Tubing String — Run and landed in the tubing hanger within the tubing head 9. Tubing Head Adapter — Connects tubing head to Christmas tree 10. Christmas Tree — Surface flow control assembly

The casing head appears early in the drilling program (step 3), while the tubing head appears at the completion stage (step 7), often months later.

Pressure Ratings and Material Selection

Both casing heads and tubing heads must meet or exceed the maximum anticipated surface pressure for the well. API 6A standard pressure ratings apply equally to both components.

Material Considerations:
- Casing heads encounter drilling fluids during well construction — ensure compatibility with mud chemicals and lost circulation materials.
- Tubing heads are exposed to production fluids for the life of the well — material selection should account for long-term exposure to produced hydrocarbons, CO2, H2S, and completion fluids.
- For sour service wells, both components require NACE MR-01-75 compliant materials (API 6A material class CC minimum).

Sizing: Casing heads are sized to accommodate the surface casing OD and the next casing string. Tubing heads are sized to accommodate the tubing OD and provide adequate annular clearance.

Common Procurement Mistakes

Based on years of industry experience, here are the most common mistakes when ordering casing and tubing heads:

1. Wrong size: Ordering a tubing head sized for the wrong tubing OD. Always cross-reference your tubing program. 2. Missing annulus outlets: Not specifying the number, size, and pressure rating of annulus outlets on the tubing head. Verify your completion design requirements. 3. Incompatible connections: Casing head bottom connection must match your surface casing; tubing head top connection must match your tubing head adapter or Christmas tree. 4. Overlooking material class: For sour wells, failing to specify CC or higher material class. This is the most expensive mistake to fix — it requires replacing the entire component. 5. Assuming interchangeability: Casing heads and tubing heads from different manufacturers may not be compatible even if they share the same nominal size. Always verify dimensional compatibility.

Casing heads and tubing heads serve complementary but distinct roles in the wellhead assembly. Proper specification of both components is critical to well integrity and operational safety. JLD Energy manufactures a complete range of API 6A casing heads and tubing heads in all standard sizes and pressure ratings, with full material traceability and third-party inspection options. Contact our technical team for assistance with component selection.

الأسئلة الشائعة

What is the main difference between a casing head and a tubing head?
A casing head supports casing strings and is installed early in the drilling program. A tubing head supports the production tubing and is installed during well completion. The casing head seals between casing strings; the tubing head seals between the tubing and production casing.
Can a casing head be used as a tubing head?
No. While they may look similar, casing heads and tubing heads have different internal profiles, load ratings, and sealing mechanisms. Using a casing head where a tubing head is required would prevent proper tubing hanger landing and could compromise well integrity.
What size tubing head do I need?
Tubing head size is determined by your production casing size (which determines the bottom connection) and your tubing OD (which determines the hanger and internal bore). Common sizes range from 7-1/16″ to 13-5/8″ for standard applications, with larger sizes available for big-bore completions.
How many annulus outlets should a tubing head have?
A minimum of two outlets is standard — one for monitoring/bleed-off and one for injection or gas lift. Some designs include three or four outlets for more complex completion requirements.
What is the difference between a casing spool and a casing head?
A casing spool is installed between casing heads when multiple intermediate casing strings are used. It provides a landing shoulder for the next casing hanger and additional side outlets. Unlike the primary casing head, casing spools are spacer components rather than foundational elements.